This mid terrace dwelling located in Chelsea and within the Westminster Conservation Area is currently on site and is progressing well. The complex construction process involves the retention of the front facade whilst the rest of the existing building has been demolished. Working closely with the planning authority and structural engineers CW-A have ensured the historical integrity of the front facade is not undermined whilst contemporary internal modifications and a rear extension is introduced